Don't Take Our Word, See Our Work

Photos from REVMA's own roof replacements, and how we run a job from tear-off to magnet sweep.

"These are our own jobs. Real Queens and Bronx houses."

Stripped to the Deck

Every roof torn off and checked before the new one goes on.

Owner-Run Jobs

Stavros prices and runs every roof.

Workmanship Warranty

In writing, on every replacement.

Ice and water shield and shingles going on a REVMA roof Finished architectural shingle roof by REVMA Roofing
Customer Story

Gordon Wanted to Know Everything

Gordon asked about all of it: which underlayment, where the ice and water shield goes, how the drip edge and starter strip get set, right down to taping his gutter guards so granules wouldn't get into them.

He wanted ice and water shield over the whole roof instead of just the valleys and edges. The material was about another thousand dollars.

Result: We put the full-coverage ice and water shield on, I didn't add labor on top of the material, and every question got an answer before the first shingle came off. That's how it should work, because it's his roof.

REVMA crew installing natural slate Finished natural slate roof by REVMA Roofing
How We Do It

Natural Slate: Keep What Is Sound

On an older slate roof the slate itself is often still good. The problems are usually the flashing, the underlayment and the fasteners holding it all together.

So we take it off carefully, sort the sound pieces from the cracked ones, and fix what's underneath. Cracked or broken slate does not go back on.

Result: A slate roof with new copper flashing and a sound base under it, and the homeowner keeps the look of the original house without paying for a whole new slate field.

REVMA crew tearing off a roof down to the deck New roof going on after tear-off by REVMA Roofing
How We Do It

Attached House: Staging the Tear-Off

On attached and semi-attached houses, getting the old roof off is half the job. A narrow driveway may not take a full-size container, and the roof meets the neighbor's roof at the party wall.

So we plan the staging before we quote, tell the neighbor before tear-off, and flash the joint at the party wall properly instead of smearing it with tar.

Result: Most shingle roofs like this go on in one day, and the street gets a magnet sweep for nails before we leave.

More Roofs We Install

Natural cedar roof by REVMA Roofing

Natural Cedar

Cedar shake replacement with ventilation behind the wood.

Composite slate roof by REVMA Roofing

Composite Slate

The slate look on a lighter synthetic tile.

Flat roof with a granulated modified bitumen cap sheet

Flat Roof

Low-slope replacement with the drainage and wall flashing worked out first.