If you own a house in Queens and the roof is starting to show its age, the first thing you want to know is pretty simple: how much is this going to cost me?
I get that question at almost every kitchen table I sit at. And a lot of companies answer it with "it depends" or "we have to come out first," which is true, but it doesn't help you plan. So I'm going to lay it out here. In this guide I'll give you real price ranges per square for the materials we install in Queens, the things that push your number up or down, a side-by-side table, why the lowest bid should make you nervous, and when a repair might make more sense than a whole new roof.
I'm Stavros Latos, the owner of REVMA Roofing, and I price every job myself. So these are the numbers I work from, not a national average somebody pulled off the internet.
The Short Answer: What Does a Roof Cost for a 2,000 Sq Ft House in Queens?
Let's cut right to it. A 2,000 square foot house in Queens usually has somewhere around 18 to 24 squares of roof, depending on the pitch, the overhangs and how many dormers you've got. A "square" is 100 square feet of roof surface. On a house with about 20 squares, here's what you should expect in 2026:
- Architectural asphalt shingles: $17,500 - $22,000
- Composite slate or shake: $24,000 - $36,000
- Natural slate: $44,000 - $70,000
Those ranges assume we strip one existing layer down to the deck, a normal pitch, and normal access. Your actual number can land higher or lower depending on the factors further down.
I know those are wide ranges. That's not me dodging the question, that's the reality of roofing. Two houses on the same block in Bayside with the same footprint can have very different roofs, because one is a straight Cape and the other is a Tudor with three valleys and a chimney. I'd rather give you an honest range than a precise number that falls apart once I'm on the ladder.
Want a real number for your roof?
Skip the ranges. See a ballpark price for your house right now, measured from satellite, with no phone call and no sales pitch.
Takes about 60 seconds · No phone call
Roofing Material Cost Breakdown
Here's what the materials we install cost in Queens as of 2026, installed, with one layer torn off:
Cost Per Square Foot by Material
| Material | Cost Per Sq Ft (Installed) | Cost Per Square | Typical Queens House (About 20 Squares) | Lifespan |
|---|---|---|---|---|
| Architectural Asphalt Shingle | $8.75 - $11.00 | $875 - $1,100 | $17,500 - $22,000 | 25-30 years |
| Composite Slate or Shake | $12.00 - $18.00 | $1,200 - $1,800 | $24,000 - $36,000 | 40-50 years |
| Metal Standing Seam | $22.00 - $26.00 | $2,200 - $2,600 | $44,000 - $52,000 | 40-60 years |
| Natural Cedar | $20.00 - $26.00 | $2,000 - $2,600 | $40,000 - $52,000 | 30-40 years |
| Natural Slate | $22.00 - $35.00 | $2,200 - $3,500 | $44,000 - $70,000 | 75-100+ years |
| Flat (EPDM, TPO, Modified Bitumen) | $9.00 - $14.00 | $900 - $1,400 | $8,000 - $16,000 (8-12 square rowhouse roof) | 20-30 years |
A quick note on those numbers. They include tearing off one existing layer, new underlayment, ice and water shield in the valleys and at the edges, new flashing, drip edge, and cleanup. They don't include extra plywood past the allowance, a second layer of tear-off, or upgrades like full ice and water shield over the whole roof.
Which Material Do We Recommend for Queens?
For most Capes, Colonials and split-levels in Queens, an architectural shingle is the right call, and it's what I install the most. It looks good, it handles the wind off the bay when the starter strip and the edges are done right, and most shingle roofs we do in one day, sometimes two for a really big roof.
If you've got an older Tudor in Douglaston or a house in Jamaica Estates with slate on it, that's a different conversation. Sound slate can sometimes be kept and reinstalled, and if you love the look but not the price, composite slate gets you close for a lot less. We're GAF certified, and whatever you pick, I'll explain what goes underneath it, because the part you can't see is what keeps the water out.
What Drives Your Roof Cost Up (or Down)
That per-square number is only the starting point. Here's what actually moves your final price.
Roof Pitch (Steepness)
A steep roof takes more time, more safety setup and more material to cover the same footprint. A low-pitch ranch is straightforward. A steep Tudor needs roof jacks, harnesses and a slower crew. Expect roughly 15 to 25% more on a steep roof.
Multiple Tear-Off Layers
We strip it down to the deck, every time, because I want to see what I'm building on. If your house already has two layers, both come off. Under the city's Building Code BC 1511.3.1.1, you can't recover over two or more existing layers, over slate or tile, or over wet or rotted roofing anyway. One layer of tear-off is in the ranges above. A second layer usually adds about $1,500 to $3,000, depending on the size.
Rotted or Damaged Decking
This is the one that surprises people. Nobody can see the plywood until the old roof is off. I include three to five sheets of replacement plywood in every quote and write the allowance down, and extra sheets are $110 each. Can I promise you'll need 20 or 30 sheets before I've seen the deck? No, so I won't sell you that.
Plywood also matters for permits. Under 1 RCNY §101-14, replacing only the covering and insulation above the deck doesn't need a DOB permit unless the Energy Code requires added insulation. Replacing deck or sheathing does. So ask every contractor what they expect to replace before you assume the job is exempt.
Roof Complexity and Penetrations
Penetrations are anything that goes through the roof: plumbing vents, skylights, chimneys, exhaust fans. Every one needs proper flashing, and flashing is where most leaks start when somebody rushes it. A simple gable with two vents is a different job from a roof with dormers, valleys and a chimney.
Access counts here too. On attached and semi-attached houses, the roof ties into your neighbor's, so the joint has to be done right. Near Bell Boulevard, we tell the neighbor before tear-off starts. And in Bayside a lot of driveways won't take a full-size container, so I plan the staging before I give you a price, not after.
Underlayment Upgrades
Underlayment and ice and water shield come in rolls at $100, $200 and $300 for a reason. Those are just examples, but the point is that the cheap roll and the good roll aren't the same product. Standard synthetic underlayment is in every quote. Upgrading to ice and water shield over more of the roof adds cost, but it's a second layer of protection under the shingle you can see.
Ventilation
A roof that can't breathe cooks the shingles from underneath and holds moisture in the attic. If your vents are inadequate, and on a lot of older Queens houses they are, adding a ridge vent or more intake at the soffits adds to the job, but it's how the new roof makes it to the end of its life.
Why the Cheapest Quote Should Worry You
Let me be direct about this, because I see it all the time in Queens and the Bronx.
Let's say a company wants $20,000 for your roof. The salesman sits down and says the one-year price is $35,000. Then there's the monthly promotion at $28,000. And if you sign today, it's $20,000. Did your roof change while you were sitting there? No. That's a tactic. Those numbers are just an example of how the pitch goes, not a typical Queens price and not a REVMA quote.
When one bid comes in way under the others, here's what usually got cut:
- Cheap underlayment or no ice and water shield where it counts
- Old flashing reused instead of replaced
- An overlay on top of the old roof instead of a tear-off
- No ventilation check
- A plywood allowance of zero, so every sheet becomes an extra
- A vague warranty from a company you can't reach in two years
I've ripped off plenty of roofs that were "replaced" a few years earlier by a hack job. The homeowner paid for a roof twice. You get what you pay for at the end of the day.
When a Repair Might Be the Smarter Move
Not every problem needs a new roof. If your roof is ten years old and the only problem is a leak at one pipe boot, it doesn't need to come off. It needs a repair.
Here's the honest part. We're a replacement company, and repairs at REVMA carry a minimum, so a small fix can cost more with us than with a repair specialist. If that's your situation, I'll tell you, even if it means you don't hire us.
- A repair probably makes sense when the roof is under 15 years old, the damage is in one spot, and the rest of it is sound.
- Replacement probably makes sense when the roof is past its life, there are leaks in more than one place, the shingles are losing granules everywhere, or the deck is soft in large sections.
If you're not sure which one you are, that's exactly what I look at when I come out to see the roof. I'll show you photos of what I find and tell you straight.
How to Compare Roofing Bids the Right Way
When you're collecting quotes, make sure every bid covers the same work. Here's the checklist:
- Material brand and product line, not just "architectural shingles"
- Underlayment type, and where the ice and water shield goes
- Flashing, all new at walls, chimneys and valleys, or reused
- Number of layers coming off
- Plywood allowance and the price per extra sheet
- Ventilation, what stays, what changes, and whether there's a ridge vent
- Warranty, the manufacturer's and the contractor's workmanship warranty, with the terms in writing
- Tear-off and cleanup, the container, property protection and the magnet sweep
One homeowner, Gordon, asked me about every one of those, right down to taping his gutter guards so the granules wouldn't get in. He wanted ice and water shield over the whole roof. That was about another thousand dollars in material, and I didn't add labor on top. He needed to understand his roof, so I answered everything.
My pricing can be 25 to 35% less than the big companies, because I don't carry their overhead. We'll price match on the same roofing system when you have the competitor's quote in writing. Our workmanship warranty is 10 years on pitched roofs and 5 years on flat roofs, on top of the manufacturer's warranty, and it's in the contract.
A Note on Financing and Insurance
We don't arrange financing. That isn't us being difficult. NYC Administrative Code §20-393(17) bars a licensed home improvement contractor from arranging financing for the homeowner, so you won't see a monthly-payment offer from us. If you want to finance, talk to your own bank or credit union first.
If the roof was damaged by a storm or a fallen limb, your homeowner's policy may cover part of it. Here's what we do: we document the damage with photos, we meet your adjuster on the roof, and we repair what's covered. We don't negotiate your claim or act for you with the insurance company. Under New York Insurance Law §2101(g), only a licensed public adjuster can do that.
What About Flat Roof Costs?
A lot of attached rowhouses in western and southern Queens, and plenty of houses in the Bronx, have a flat or low-slope roof. We replace EPDM, TPO and modified bitumen, and they run about $900 to $1,400 a square. A typical 8 to 12 square rowhouse roof lands somewhere around $8,000 to $16,000.
On a flat roof, the price depends on where the water goes, the parapet walls and coping, and how the membrane meets the walls and the openings. If any of it is torch-applied, the FDNY requires a Certificate of Fitness holder on site. Make sure every quote you compare is for the same system and the same drainage details.
Ready for your actual number?
Our instant estimator gives you a ballpark price for your own roof in about a minute. No calls required.
Takes about 60 seconds · No phone call
Ready for a Straight Answer About Your Roof?
I wrote this because you deserve real numbers before you spend a dollar on your roof. You deal with me from the first visit to the last nail, and I'd rather you understand every line of the quote than sign something you don't.
We're based in Bayside and we work across Queens, Bayside and the Bronx. We're licensed by NYC DCWP (2126882-DCWP) and we have 64 Google reviews at 5.0. If you want to read more about how we do a roof replacement from tear-off to cleanup, start there.
Request your estimate and I'll come out myself, go through the material, the access and the scope with you, and put one price in writing. Peace of mind once I leave there, that's the goal.